Ramsey County Projects Overview

These are some road projects coming up in the Northeast Metro (Northern Ramsey County). If you want to see better pedestrian and bicycling facilities included in these projects then make sure you let your county commissioners and appropriate city council folks know. Planning often begins two to four years prior to construction and it’s difficult to get changes included after about 6 months prior to construction. Adding proper pedestrian and bicycle facilities now, during construction, is very minimal cost. If it’s not done now, it will be another 30 years before the chance comes around again.

I am not including general signal revisions or mill & overlay projects. These though can be found in the Ramsey County TIP Report. Even though not major projects, these do offer opportunities for improvements to pedestrian and bicycle transportation such as better designed signals and button placements or narrowing of vehicular lanes and/or inclusion of bike lanes, cycle tracks, or paths on mill & overlay projects.

2014

Lexington Ave from approx 694 to County Road F (AH/SV) – Reconstruction.

Maryland Ave @ Payne Ave (SP) – Reconstruct Geometrics/Signals.

Highway 61 through downtown White Bear Lake (WBL) – Mill & Overlay plus additional improvements

2015

Hiway 96 from 35W to Old Hiway 8 (AH/NB) – Reconstruction

Lexington Ave @ Hiway 36 (RV) – Reconstruct Interchange. It is critical that they include adequate pedestrian and bicycle facilities on both sides of Lexington as well as allow safe crossing of Lexington.

Hiway 10 @ County Rd H (MV) – Geometrics/Signals.

County Rd E @ Snelling (AH) – Bridge Reconstruction. Critical that they include adequate pedestrian and bicycle facilities on both sides of Cty E and include a bicycle path along Snelling (under Cty E). Sadly they have included no safe bicycling facilities where Cty E has been reconstructed this summer between Snelling and Lexington. This is doubly critical to provide students at Bethel Univ with a safe route to Lexington Ave retail (they currently use the railroad line & bridge).

Raymond Ave from Hampden Ave to Energy Park Dr. (SP) – Reconstruction.

2016

Rice Street from Cty B2 to Cty C2 (RV/LC) – Reconstruction.

Hodgson Road from Gramsie to Bridge St. (SV/VH) – Reconstruction.

Raymond Ave from Energy Park Dr to Como Ave. (SP) – Reconstruction

County E2 @ 35W (NB) – Bridge Replacement.

2017

White Bear Ave @ 694 (WB/MW) – Interchange Reconstruction.

Hiway 96 @ 35E (WB/VH) – Interchange Reconstruction

Cty Rd D from Cleveland to Fairview (AH) – Reconstruction

Rice Street from N. Owasso Blvd to Vadnais Blvd (VH/SV/LC) – Interchange Reconstruction.

Shoreview: Lexington Avenue Reconstruction (Updated July 23, 2013)

Lexington694toCRFpremliminarylayout91712 copy

Update (23 Jul, 2013): A crossing has been added across Lexington just north of the 694 ramps. This will be good news for Land O’ Lakes folks and anyone who ventures down the path on the west side of Lexington without realizing that it’s effectively a dead-end.

They are also exploring the addition of refuges.

They are exploring adding No Turn On Red signs at Lexington & F though agree that these are not always effective with U.S. drivers. They are also concerned about how this might delay motor traffic.

All path/pedestrian ramps will be full path width. I assume this means that cyclists can safely ride to street level at any point across the ramp. No word yet on dealing with the jarring bumps of current designs or with anti-skid rumbles.

More to come.

—-

Ramsey county plans, in 2014, to reconstruct Lexington Avenue between Red Fox Rd (just south of 694) to just north of it’s intersection with County Road F, as well as nearby portions of County Road F. Expanding the Lexington & F intersection is the primary driver of this project.

Click for latest project plan.

They have included some pedestrian and cycling infrastructure, but the current plan still leaves this corridor dangerous for both pedestrians and cyclists, particularly at the Lexington & F intersection that is the core of this project. Given the additional lanes, potentially higher motor vehicle speeds, lack of crossing refuges, and other elements, this corridor may be more dangerous for pedestrians and cyclists after this project is complete than it is currently.

Shoreview has some of the best cycling and pedestrian infrastructure in the Twin Cities (and the U.S.). It will be a shame if this project does not continue this leadership.

Below are some concerns with the current plan as well as some possible recommended solutions.

Continue reading